top of page

Consented Development Sites Across the South of England: October 2026

Writer: Millen Homes
Millen Homes
2 days ago
4 min read

We spend most of our week taking difficult sites through planning across the south of England, from Bath to Essex and Cambridge to Sussex. Former garages, Green Belt edges, sites with a refusal or two behind them. This is a round-up of some of the schemes we have secured consent on, for housebuilders, developers and investors who would like to talk about any of them.

The short answer: we currently have consented sites in Chesham, Amersham and Chalfont St Giles in Buckinghamshire, Thundersley and Great Dunmow in Essex, and Oakington in Cambridgeshire. If you would like details on any of them, email us at hello@wearemillen.com


Our consented development sites, October 2026

  • Chesham, Buckinghamshire: consent on a former garage site at Pond Park Road, with a detailed application for three chalet bungalows now submitted.

  • Amersham, Buckinghamshire: two detached houses at Ambers of Amersham.

  • Chalfont St Giles, Buckinghamshire: three homes with planning at the front of Three Households, with a second phase of three more now applied for.

  • Thundersley, Benfleet, Essex: eight detached bungalows on Green Belt land at Rayleigh Road, outline consent with no affordable housing.

  • Great Dunmow, Essex: eight detached houses at Highwood Farm.

  • Oakington, Cambridgeshire: eight detached houses at Manor Farm Close.

You can see these alongside the rest of our pipeline on our current developments page.


Why buy a site that already has planning?

Planning is where most of the risk in a small development sits. Surveys, consultants, application fees, months of waiting and, sometimes, an appeal. A consented site swaps that uncertainty for a known scheme, a known number of homes and a timetable you can plan around.

For a smaller housebuilder, that can be the difference between capital tied up for years and a start on site within months. It also frees you to do what you are good at, which is building well, while someone else has carried the planning risk.

There is a wider point here too. Plenty of land is promoted. Far less of it makes it all the way to a decision notice, and less still on the small, awkward sites that make up so much of the land around our towns and villages.


Site layout plan for land rear of Rayleigh Road, Benfleet Essex, showing bungalows, roads, trees, and approved adjacent development.

What does consented actually mean?

Not all permissions are the same, so it is worth being clear which kind you are looking at.

Outline permission

Outline permission establishes the principle of development, often with some details fixed, such as access, layout or scale. Everything else follows in a later application.

Reserved matters

Reserved matters are the details left open at outline stage, usually appearance and landscaping, and sometimes layout and scale. They normally have to be submitted within three years of the outline permission, unless the permission says otherwise.

Full permission

A full, or detailed, permission approves the whole scheme in one go. It leaves less to argue about later, and less room to change the design without a further application.


What should you check before buying a consented site?

  • Conditions: which must be discharged before work starts, and how much work each involves.

  • Section 106 and CIL: what is payable, and when. The Government's Community Infrastructure Levy guidance explains how CIL works.

  • Biodiversity net gain: how the required gain will be delivered, on site or off site. See the biodiversity net gain guidance.

  • Deadlines: when reserved matters must be submitted and when development must begin.

  • Access and services: whether the approved access is in your control, and what utility connections to the boundary will cost.

  • The officer's report: it often tells you more than the decision notice about what the council will accept at the next stage.

If you are buying a single plot rather than a whole site, our guide to the 10 things to check before buying a building plot covers the same ground in more detail.


Why are so many of our sites small?

Because that is where the gap is. Large housebuilders rarely look at a site for two or three homes, yet small sites carry the same surveys, the same policy changes and the same risk of refusal as large ones, spread across far fewer homes. Our Pond Park Road permission in Chesham took five years for exactly that reason.

Small sites are also where many of the homes people actually want come from: bungalows, detached family homes and village plots. Our eight Green Belt bungalows in Benfleet are a good example of a scheme a volume builder would never have chosen to promote.


Talk to us about a consented site

If you are a housebuilder or developer looking for consented land, email Ben at ben@wearemillen.com or get in touch with the team. If you are a landowner wondering whether your land could join this list, you can find out what your land could be worth, and if you have a site of your own that needs planning, our planning consultancy can help.


Frequently asked questions

What is a consented development site?

A consented site is land that already has planning permission for a specific development, such as a number of homes. Consent can be outline, which approves the principle and some details, or full, which approves the whole scheme.

What is the difference between outline and full planning permission?

Outline permission establishes that development is acceptable in principle, with some details approved and the rest, called reserved matters, left for a later application. Full permission approves every aspect of the scheme at once.

How long does planning permission last?

Full permission normally requires development to begin within three years. For outline permission, reserved matters usually have to be submitted within three years, and development must then begin within a set period. Always check the conditions on the decision notice, as a council can set different time limits.

What should I check before buying land with planning permission?

Check the conditions, any Section 106 obligations and Community Infrastructure Levy, how biodiversity net gain will be delivered, the deadlines for reserved matters and starting work, control of the access, and the cost of services. The officer's report is also worth reading in full.

Can I change the design of a consented scheme?

Often, yes. Small changes can sometimes be made through an amendment, while larger changes may need a variation of conditions or a fresh application. How much flexibility you have depends on what the permission fixes.

Where are We Are Millen's consented sites?

Our October 2026 round-up includes Chesham, Amersham and Chalfont St Giles in Buckinghamshire, Thundersley and Great Dunmow in Essex, and Oakington in Cambridgeshire. Email ben@wearemillen.com for details on any of them.

Comments


-post-ai-image-63920.png

GET IN TOUCH WITH THE TEAM

Left with questions?
We have answers.

bottom of page